SIA “Aloja Starkelsen”

Grey pea production line
Year
2021 / 2023
Installed equipment
  • Food-grade conveying equipment
  • Dosing units
SIA “Aloja Starkelsen” — GRAINTECH project

About the project

In 2019 we started designing a grey pea hulling line.

Together with our partner JK Machinery we carried out grey pea sorting tests, and the line and the equipment were designed and adapted for the most efficient results.

In 2021 we started installing the line, which now operates successfully at 2 t/h.

In 2023 we also installed an intake point for the hulling line, which includes:

  • 60 t truck scales with automatic load registration
  • Intake pit with dust extraction
  • JK Machinery 60 t/h pre-cleaner
  • 6 × 300 m³ hopper storage silos with temperature monitoring
  • 60 t/h conveying system